Kiilto Pro Plan Craft
A self-levelling, cement-based pumpable screed
A fiber-reinforced, low alkali, fast-setting pumpable screed for heavy-duty applications in new build and renovation. Provides also a suitable substrate for e.g. epoxy and PU coatings.
Special features
- pumpable
- fiber-reinforced
- walkable and coatable soon after application
- provides a strong substrate for nearly all floor materials
Links
Materials
Kiilto Pro Plan Craft is a fast-setting, self-levelling and fibre-reinforced pumpable screed for levelling and smoothing in interior areas. Also suitable for manual application.
Suitable for new build and renovation in homes, offices and public premises. Used for levellings as well as for construction of slopes in interior areas. Suitable substrates include concrete, lightweight concrete, ceramics/natural stone, chipboard and wooden floors.
Kiilto Pro Plan Craft is used for bonded and unbonded (floating) structures. Compatible with both electric and water underfloor heating.
The screed layer must be coated/covered with a suitable product, such as ceramic tile, laminate, engineered wood flooring, vinyl flooring, PU- or epoxy coating. Allows only light industrial load.
A low alkaline screed layer protects the adhesive and vinyl coating from the damages caused by alkaline moisture in the concrete. Tests have shown that a 5 mm screed layer provides a protective effect.
+10 - 25 °C (mixed mass)
> 2 MPa
CT-C30-F7 (EN 13813), M1
2 - 30mm layer can be coated after 1-3 days depending on layer thickness and drying conditions (+23°C, 50% RH). A layer over 30mm, substrate's humidity and cool or/and humid conditions retard drying.
In the installation of flooring, follow the flooring manufacturer's instructions.
C30 ( C > 30 MPa), EN13813
1.75 (kg powder/sqm/mm)
1.75 (kg powder/sqm/mm)
RWFC 450
RWA 100
(EN 13813)
A1
F7 (F > 7 MPa), EN 13813
2-50 mm
min. 20 mm screed on top of underfloor heating pipes / cables
* When applying thin layers, take into account product’s spreading properties.
Water requirement: 20%, 4 litres per bag
Water temperature: +5°C - +20°C
Mixing time: 2 minutes
20 min
< 0.04 %
Storage time dry compound: 6 months
Temperature dry compound: +10°C - +25°C
Concrete < 95 % RH
Resin-cement-quartzsandbased powder
TVOC 28 days µg/m2 x h: <200
Flow EN 12706 (mm): 130-140
1- 3 h
Substrate and room temperature 10 - 25 °C
Mixed mass must be use within 20 minutes after mixing.
≤ 11
A bonded floor structure:
Ensure that the substrate is suitable for the product, e.g. sufficiently strong concrete. The substrate must be clean, dry, even, free from cracks, uncoated, free from oil and grease or any other substance that might impair adhesion and the final result. Remove cement laitance and smooth out possible irregularities. Smooth and dense surfaces must be sanded mechanically or ground, if necessary, to ensure proper adhesion. The documented bond strength of the substrate in areas with normal traffic must be 1.0 MPa at the minimum.
Layer thicknesses:
Concrete: 2-50 mm
Lightweight concrete: 6-20 mm
Ceramics/natural stone: 2-50 mm
Chipboard: 2-50 mm *
Wooden floor: 2-50 mm
* The chipboard must be min. 22 mm thick. The floor board/structure must be sufficiently rigid.
EXPANSION JOINTS IN THE SUBSTRATE
Expansion joints in the levelling screed are applied, where applicable, through the entire layer thickness down to the substrate. These must be installed in immediate connection to, and in conjunction with the expansion joints in the substrate and the load-bearing structure, respectively. The width of the joint should be 10-15 mm. Alternative solutions may be available.
A floating floor construction:
The total layer thickness must always be 30 mm at the minimum and a steel mesh (Ø3 mm, 50x100 mm) or a fibreglass mesh must always be used with the screed. The reinforcement mesh is installed with min. 50 mm overlap. The screed is separated from the substrate with e.g. a filter cloth, if necessary. Larger areas must be divided into smaller, separated sections.
The surface under a floating surface material must be sufficiently smooth. The surface is sanded or smoothed, if necessary. To floating constructions, the surface materials must be installed as soon as possible. If the floor is left uncovered for a longer period, the levelled floor must be treated with Kiilto Pro Primer 001 primer diluted with water (1 part primer : 3 parts water) on the next day after levelling to prevent the floor from cracks and edge rise.
Preparation:
Correct temperature is vital for a successful result. The substrate temperature must be min. +10 °C. The temperature must be monitored and ensured well before priming. Higher temperature is beneficial for the quality and drying time. Maximum temperature +25 °C.
Priming:
When priming with Kiilto Pro Primer 001, always follow the instructions given in the technical data sheet. Apply primer 1-48 h prior to levelling, and always let dry before applying the screed. However, do not let the primer dry for more than 3 days, since the construction dust and other impurities may adhere to the primer coat and impair the adhesion of the screed. Note, if the primer is applied on larger areas with the so called primer pump, the primer must always be rubbed onto the substrate with a brush.
If working with non-absorbent substrates, please contact Kiilto.
BALANCING
If the slope and curvature of the substrate deviate from the stipulated tolerance, the floor should be balanced using a level peg or laser. Inserting height-adjusted level pegs allows you to ensure that the layer thickness is sufficient to cope with the tolerances when laying the levelling screed.
Mixing:
Make sure that the screed is homogenous and consistent, fluid and free of lumps. When making slopes, reduce the amount of water to ensure the right consistency. Water temperature: +5...+20 °C.
Instructions for use:
Kiilto Pro Plan Craft is pumped straight from the pumping truck on the substrate in stripes. A new stripe is applied on the previous one as soon as possible, so that they blend in and form an even and smooth layer. Make sure that the width of the applied stripe do not exceed 10 meters. Larger areas must be divided in smaller sections.
Check carefully that the drains and other penetrations are properly sealed before applying the screed to avoid clogging up discharge pipes and having screed spilled on surrounding surfaces.
Work the screed with a notched trowel or similar tool to ensure as smooth surface as possible. If applying several screed layers, apply primer between each layer. Let the first layer dry at least 24 h prior to priming. Check and make sure that the surface is so dry that the substrate absorbs the primer. Mixing ratio for priming a new screed layer: Mix Kiilto Pro Primer 001 in 3-10 parts of water depending on the drying conditions and substrate's absorbency. Apply primer twice, if using over 7 parts of water.
Semi-hardened screed is easy to mold or cut. If planning to make leveling, do not wait too long.
Drying:
The drying time of the screed depends on the substrate humidity, layer thickness, air temperature and relative air humidity. Effective air ventilation accelerates drying.
For more information on the product’s self-drying properties, please contact Kiilto contact person (pumpable screeds).
Screed can be applied on concrete with RH 95%.
Note: The screed cannot withstand shrinkage or deformation due to drying of the substrate.
Before installing a surface material, always make sure that the structure of the substrate is dry enough. The given drying times require a dry substrate, favorable drying conditions (approx. +20 ° C, RH 50%) and good ventilation. Pay special attention to the floor's humidity with moisture-sensitive flooring materials.
To prevent the screed from too quick drying and cracking, the applied screed should not be exposed to draft, high temperatures or direct sunlight during the first 3 days after application.
Water underfloor heating with accurate temperature control can be brought up to its operating temperature gradually after two weeks. Start by raising the temperature to +15 °C or to floor's current temperature, if it is higher. After that, the floor temperature can be raised by 2 degrees every third day. If the room temperature is much lower than the temperature of the screed, the floor temperature must be raised slower.

The information given in this product data sheet is based on our tests and our practical knowledge. The technical data is defined in standard conditions. Variations in local working conditions and methods will affect the product performance and result. The result is also strongly affected by working methods. We guarantee the high quality of our products according to our Quality Management System. No liability can be accepted from incorrect use of the product or prevailing conditions, over which we have no control. Thus, we cannot be held responsible for the final result. To use the product properly, please read the product brochure, work instructions and the safety data sheet available at www.kiilto.com.
The product contains cement which, when mixed with water, has a corrosive effect on the skin and mucous membranes of the eyes, nose and throat. Wear protective gloves, respiratory protection and goggles and make sure you follow the safety instructions that apply to the workplace.