Checklist

  • You can add products to your checklist.

By emailing the checklist to yourself, you will receive the Product Brochure and Safety Data Sheet to your inbox in PDF format.

SubmitPrint

Kiilto TopPlan DF Pintatasoite 1–10 mm

A floor smoothing compound with excellent self-levelling properties. Especially for floors that will be covered with a floor covering. Gives a hard and smooth surface. Suitable also for levelling floors that are going to be painted. Low alkali.

Special features

  • dust reduced
  • long working time
  • fine smoothings of floors
  • pumpable, also paintable
  • walkable approx. 5 h
  • coatable in 10 mm / 16 h

Application

Suitable for levelling floor surfaces at thicknesses of 1–10 mm before laying the floor covering. In small areas (approx. 1 m²) at a thickness of up to 20 mm.

The substrate must be clean, solid and firm. Remove cement laitance, paint splashes, adhesive residue and other impurities, and brush or vacuum the floor thoroughly.

Concrete subfloors are pre-treated with 1:4 diluted Kiilto Start Primer or Primer One (20% Kiilto primer/80 % water) prior to the application of the floor screed. Surfaces under renovation as well as board surfaces must be primed with undiluted Kiilto Start Primer or Kiilto PrimerOne before levelling. Non-absorbent substrates, such as ceramic tiles or painted surfaces, can be treated also with Kiilto Fix Primer.

The concrete subfloor must comply with national standards.

Coverage

1.6 kg/m² (1 mm layer thickness)
One bag gives approx. 12 litres mass.

Package Size

EAN Code

20 kg 6411512292205
Package Size 20 kg
EAN Code 6411512292205
 

Type/binder

Resin-special cement-quartz-based powder

pH

< 11 (low alkali)

Bond strength

> 2 MPa, EN 13813

Compression strength

C30 ( > 30 MPa), EN 13813

Flexural strength

F10 ( > 10 MPa), EN 13813

Shrinkage

< 0,6 ‰ ( 23 ºC, 50 % RH )

Mixing ratio

4,8–5,0 l water / 20 kg bag

Viscosity

Flow rate 155–165 mm, EN 12706

Classifications and certificates

CT-C30-F10 (EN13813), M1

Working time

30–40 minutes ( 23 ºC, 50 % RH )

Application temperature

Optimal +18–23 °C, minimum +10 °C

Package sizes

20 kg bag

Substrate humidity

Concrete < 90 % RH

Fire class

A2fl-s1

Coverage

1.6 kg/m² (1 mm layer thickness)
One bag gives approx. 12 litres mass.

Layer thickness

1–10 mm
20 mm in small areas, max 1m²

Walkable

approx. 5 hours ( 23 ºC, 50 % RH )

Max. grain size

0.3 mm

Coatable

10 mm / 16 h
( 23 ºC, 50 % RH )

Storage

Unopened package 1 year in a dry place

Instructions for use

Fill the mixing container with the required amount of clean water. Strew TopPlan DF powder slowly while stirring in cool (+10–25 °C), clean water until a smooth, flexible mass is formed. Let the mix mature for approx. 2 min. and then remix once before use.

Apply screed evenly by using a steel or notched trowel. Screed can also be applied by using an appropriate floor screed pump. The layer must be dry before a new layer is applied.

The drying of the screed must not be accelerated by heat or ventilation, since too quick a drying may cause hair cracks. If the temperature in the levelled room is higher than normal, the relative humidity very low, or if the levelled floor surface is exposed to direct sunlight, we recommend covering the floor with a tarpaulin as soon as it is dry enough to allow walking. The floor should be covered with a flooring relatively soon after it has hardened and dried. This will prevent the surface from over drying, cracking and becoming loose.

Suitable also for floors that are going to be painted in secondary rooms with light traffic, but not, for example, in garages or for bathroom floors.

In areas where waterproofing is used, e.g., bathroom floors, floor levelling should be applied under the waterproofing membrane.

Not suitable for areas permanently under water (e.g., swimming pools).

Note! Avoid excessive use of water, since it will weaken the surface strength and may cause separation or cracking.

Environment and safety

Avoid unnecessary skin contact and exposure to the fresh product, use safety gloves. Refer to material safety data sheet. For information on product and package disposal, go to www.kiilto.com.

M1CELEEDNordic EcolabelMade in Finland, Key flag