Checklist

  • You can add products to your checklist.

By emailing the checklist to yourself, you will receive the Product Brochure and Safety Data Sheet to your inbox in PDF format.

SubmitPrint

Kiilto Solid Parkettiliima

A PVAc-based adhesive with a high solid content. Suitable for laying mosaic and block parquet flooring and step sound insulation cork. Depending on the parquet type, suitable subfloors are sufficiently firm concrete, floor levelling or plywood.

Special features

  • for laying mosaic parquet and step sound insulation cork
  • high solid content

Application

For laying mosaic parquet flooring and step sound insulation cork. Well suited also for gluing of solid block parquet on plywood, but only if mechanical fixing is also used. Suitable to be used with underfloor heating. Has M1 Emission Classification for Building Materials.

Coverage

1.7 m²/l

Package Size

EAN Code

15 l / 19 kg 6411511375152
Package Size 15 l / 19 kg
EAN Code 6411511375152
 

Type/binder

PVAc

Density/specific weight

approx. 1.3 kg/l

Open time

approx. 20 min (+20 °C, 50 % RH)

Application temperature

+18–25 °C

Package sizes

15 l

Substrate humidity

concrete: max. 3,0 w-% or 80 % RH
wood: 8–12 %

Frost resistance

Freezing (adhesive joint is cold-resistant)

Coverage

1.7 m²/l

Storage

In unopened containers, above +1 °C, for 18 months. After long storing, stir before use.

Instructions for use

Suitable substrates are steel-trowelled concrete, plywood, chipboard, cork board and wooden floor. Substrate must be dry, solid, smooth and free from dust and other materials that might impair adhesion. Concrete subfloor can be levelled with a mosaic parquet subfloor levelling compound produced by Kiilto Oy (for example, Fiberflex DF), if needed.

Carry out work at normal room temperature and humidity. Allow parquet boards and adhesive to acclimatise to the normal room temperature and humidity. Apply the adhesive evenly with a notched trowel to an area that can be covered with parquet while the adhesive surface is still fresh. Press the parquet sheets onto the surface. Check that the back of the parquet is fully covered with adhesive. Leave a clearance of 10–15 mm between solid structures, e.g., wall and parquet. Sanding is recommended after 3–6 days at the earliest.

Environment and safety

Avoid unnecessary skin contact and exposure with the fresh product, use safety gloves. Refer to material safety data sheet. For information on product and package disposal, visit www.kiilto.com.

M1LEEDMade in Finland, Key flag